We started renovations on the Living Room, Dining Room and Kitchen (open floor plan space) November 18, 2020 with thoughts that surely the job would be done all but the last touches by Christmas! HA! That didn’t go quite as planned and we finally pronounced the room ‘finished’ February 15, 2021; 13 weeks in all. But I am so happy with the final result!
BEFORE:

“island” connected to nothing 


…those pink walls though… 
Storage box things in the Bay windows 
Doesn’t everyone want a sink in the dining area? 
The Wall. Solid concrete and stone. No known purpose whatsoever.
AFTER!!





Contact phone charger 
Pop-up Phone charger and Electric outlets 
So how did we get from there to here….



THE DUST! yuck! 

Trench to put elec outlet in floor 
moving the sink from the middle of the floor to the back wall 
Cutting in a new Window in the back wall 
Finally done removing the tile floor now for all that thin set!! 
Ready for inspection… 
Finally a clear floor

Sheetrock and cieling texturing 





Lucy-In-The-Sky Granite 


I LOVE this stone soooooooooo much!
Now to work on the outside entry, pain the outside and put my back patio in order..